ACCOUNTING INFORMATION SYSTEM AS A MEANS OF ENHANCING FINANCIAL MANAGEMENT OF TRANSPORT

Amount: ₦5,000.00 |

Format: Ms Word |

1-5 chapters |




Abstract

Accounting information system in a transport organization has been a great problem to the third world countries in general, which Nigeria as a country has its own share. This research work, “Accounting information system in a transport organization, suggests ways of minimizing the effects of the problems of inefficient accounting information. It is believe that an improvement in this regards will enhance the performance of the corporation. To enable the researcher find solution to the problem of this study, some questions were raised in the form of hypotheses, which were developed comprising the null and alternative hypotheses. The methods of data collection were primary and secondary data method. The data collected were analyzed by use of simple percentages while chi-square was used to test the hypothesis formulated for validity. Findings show that accounting information is an indispensible tool in the management of Nigeria Railway Corporation and the activities of unqualified and incompetent accounting officers are responsible for the performance of the accounts departments in Nigeria Railway Corporation. Based on the findings, the researcher concludes that the accountant should put more efforts especially when computing the financial statement since accounts fraud result from ignorant of proper accounting procedures. Since the financial statement are sources of document of accounting information, efforts should be made in generating more relevant, timely, effective and accurate accounting information necessary for prevention or detection of fraud.

 

CHAPTER ONE
INTRODUCTION
1.1 BACKGROUND OF THE STUDY
The Nigerian Railway Corporation (NRC) has been in existence for years. It is regarded the largest transport corporation in Nigeria and has a high network operations. The Nigerian railway corporation is One Hundred and Fourteen years (114) old and it runs a unilaterally designed track system of 1067mm charge gauge. Only 30km of its track distribution is in double track and that is within Lagos area. Nigerian Railway Corporation actually commenced rail business activities with the construction of the first rail line from Lagos to Ibadan 193m between 1998 and 1901. By 1964 when the construction of 640km Kano-rail line, then known as Bornu extension, was completed, the present core of the railway network hard been put in place.


This material content is developed to serve as a GUIDE for students to conduct academic research


ACCOUNTING INFORMATION SYSTEM AS A MEANS OF ENHANCING FINANCIAL MANAGEMENT OF TRANSPORT

NOT THE TOPIC YOU ARE LOOKING FOR?



A1Project Hub Support Team Are Always (24/7) Online To Help You With Your Project

Chat Us on WhatsApp » 09063590000

DO YOU NEED CLARIFICATION? CALL OUR HELP DESK:

  09063590000 (Country Code: +234)
 
YOU CAN REACH OUR SUPPORT TEAM VIA MAIL: [email protected]


Related Project Topics :

Choose Project Department